Summary
American Management Resources Corporation (AMRC) performed asbestos abatement, consulting and monitoring within a 4-story commercial building. The asbestos-containing material removed consisted of over 40,000 ft2 of various flooring materials including rolled vinyl and vinyl composite tile with mastic.
![](https://amrcfl.com/wp-content/uploads/2021/09/challenge-1024x768.jpg)
Challenge
The asbestos-containing flooring materials were in an area completely open to the exterior environment.
![](https://amrcfl.com/wp-content/uploads/2021/09/solution-1024x768.jpg)
Solution
Using 6 mil polyethylene, the work area was contained by constructing temporary barriers. The work area was placed under negative pressure using air filtration devices that were HEPA filtered.
![](https://amrcfl.com/wp-content/uploads/2021/10/20210128_094223-1024x768.jpg)
Project Highlights
- The challenges were overcome by the AMRC team.
- The project was completed on time and within the budget!